Signage schedule from your floor plans

Send us the architectural set and we will send back a signage schedule — every statutory sign the building needs, line by line, with quantities, materials, sizes and the standard each one answers to. No charge, no obligation.

It is built for the person holding a drawing set and a programme: builders, developers, project managers and certifiers who need to know what signage the job requires before they can price it or order it. You do not need to know what the signs are called. That is the part we do.

1Upload Plans
2Your Details
3Your BOQ
4Quote Sent

Upload Your Building Plans

Upload a PDF or image of your floor plans. Our AI will identify every statutory sign required under the NCC/BCA and generate a Bill of Quantities with live pricing from our store.

📐

Drag & drop your building plan here

or

PDF, JPG, PNG or WebP — Max 64MB

What comes back

An itemised schedule, not a price list. Each line carries:

  • the sign, and how many of them the building needs;
  • the material and size, chosen for where the sign goes — satin anodised aluminium on a commercial door schedule, composite ACM for a car park, brushed aluminium where the sign has to carry raised characters and braille;
  • the standard or Code provision it answers to;
  • and a placement note tied to your drawings — the door number, the room number and the sheet it appears on, so an installer can work from the schedule alongside the set without interpreting anything.

Lines we cannot price from the drawings alone are marked rather than guessed at, with a note saying what we need in order to price them.

How it works

  1. Upload the set. PDF, JPG or PNG, up to 64MB. A full architectural set is fine — the whole issue, not a selection.
  2. We read it. Every sheet: floor plans, door schedules, fire services layouts, elevations and the detail sheets where the project’s own signage types are drawn.
  3. We check it. Nothing goes out on an automated pass alone. The schedule is reviewed against the catalogue before you see it, which is where the material and size decisions get made.
  4. You get the schedule and a quote. Review it, change quantities, strike out what is not applicable, and tell us what is custom. We re-issue.

What it looks like in practice

A recent six-storey residential building with a basement car park came in as a 63-sheet set. The schedule that went back ran to 126 statutory signs across 27 line items — fire door and smoke door plates counted off the door schedule, exit and stairwell signage for both fire stairs at every level, braille and tactile signs to the accessible facilities, switchboard and plant room identification, evacuation diagrams, and the accessible and visitor bay signage in the basement.

The developer came back with quantities confirmed, a handful of lines marked not applicable and a list of the signs he wanted in the building’s own branding. That is the normal shape of it: the first schedule gets the scope right, the second gets the job right.

What we read it against

The National Construction Code, and the Australian Standards it calls up for signage. In practice that usually means some combination of:

  • AS 1428.1 — braille and tactile signage, accessible facilities and the mounting that goes with them
  • AS 2293 — exit and emergency signage
  • AS 2444 — fire equipment identification: hydrants, hose reels, extinguishers, boosters
  • AS 1905.1 — fire-resistant doorsets, and the plates that go on them
  • AS 1319 — safety sign layout, colour and wording
  • AS/NZS 3000 — switchboards, switchrooms and electrical services
  • AS 3745 — evacuation diagrams
  • AS 2890.6 — accessible parking bays and the signage that identifies them

Which of these apply depends on the building’s classification and its fire engineering, which is why the schedule names the provision against each line rather than claiming the set as a whole is compliant.

What it does not do

Worth being straight about the limits, because they decide how you use it.

It is a schedule, not a certificate. Responsibility for compliance sits with the certifier and the fire engineer, and the schedule is there to make their job quicker, not to replace it. If the architectural set is silent on something — a smoke door that is not tagged, a plant room that is not labelled — it will not appear, and those gaps are called out rather than filled in.

We also do not mark pins on your drawings. We tried it; the sheet and its features were identified correctly every time, but the marker positions landed far enough out to send an installer to the wrong wall. Keying each line to the drawing’s own door, room and sheet references is less impressive and considerably more useful.

Installation and freight are quoted separately, because both depend on site access and programme rather than on the schedule.

What it costs

The schedule is free. You are under no obligation to order from it, and plenty of people use it purely to get a number into a tender.

If you do order, quantity pricing applies automatically across the whole order — 10% from 10 signs, 15% from 25, and 20% from 50. On a building of any size the schedule will put you past the first tier on its own.

Everything is made to order in Sydney, which is why non-standard wording, a custom size or a sign in your own colours is a conversation rather than a problem.

What to send

The full architectural set if you have it, as issued. Door and window schedules are the single most useful sheets after the floor plans, because that is where fire-rated doors, smoke seals and door numbering live. Fire services drawings help. If the building has a fire engineering report with a signage schedule of its own, send that too and we will reconcile the two.

Tell us the building classification if you know it. If you do not, say so — we will work it out from the plans, and it is better to have it determined from the drawings than assumed.